Day 10 - After Construction

Well it was a busy day inside the house.  The carpet was laid in the family room, the grout is being put down in the tiles, the appliances are back where they belong and the TV/Stereo system is hooked up and working.  Along with that we tested 4 loads of clothes in the washing machine to ensure it was working properly.

So here are the images for today:

All images are taken with the EOS-M w/ EF-M 22mm f/2 STM @ f/3.5
The Family Room
1/40 SEC @ ISO 100

1/30 Sec @ ISO 100
 Putting Grout down
1/30 sec @ ISO 500
1/40 sec @ ISO 500
 Tile Design in the Foyer
1/30 sec @ ISO 1250
Tile Design In the Kitchen 
1/40 sec @ ISO 2500
 The Laundry Room
1/30 sec @ ISO 1250

Ok, that's it for today.  Off to work